GVAwood
Ash Solid Wood Bauhaus Retractable Makeup Table
Ash Solid Wood Bauhaus Retractable Makeup Table
Couldn't load pickup availability
1. The "100% pure solid wood" mentioned on the page refers to the wooden parts other than hardware and accessories (metal, glass and other non-wooden parts), and does not include artificial boards and is not veneered.
2. The main material is imported ash, which is tough and elastic, with neat and beautiful wood grain.
3. The auxiliary material is pine wood imported from New Zealand, which has good toughness, stable properties, light texture, straight grain and few knots. It is used for the front and rear horizontal and center frames of the bottom.
4. The auxiliary material is paulownia wood, which is corrosion-resistant, wear-resistant, high-temperature resistant, non-deformable, and not easy to mold. It has been the material for making bellows rods since ancient times. It is also a famous wood for making musical instruments in ancient China, used for drawers and bottom plates.
5. The cabinet legs are made of 201 stainless steel with a wall thickness of 2mm.
Share
